首页联系方式

FAX
+86-535-8111388

E-MAIL
jiuzhou@jiuzhoutouzi.com

ADD
No. 169 Wenquan Road, Zhaoyuan, Shandong Province, China

九洲投资

底部版权

Copyright©    Jiuzhou Investment Co., Ltd.  All rights reserved

鲁ICP备07001217号   Powerec by: 300.cn

WeChat

可信组件
NEWS
Jiuzhou Investment
>
>
>
The Sixth Institute of Geology and Mineral Resources "Shuiwangzhuang Mining Area Gold Mine Exploration and Drilling Project" officially resumed work

The Sixth Institute of Geology and Mineral Resources "Shuiwangzhuang Mining Area Gold Mine Exploration and Drilling Project" officially resumed work

[Abstract]:
Recently, the Sixth Institute of Geology and Mineral Resources has insisted on “two hands” in epidemic prevention and control and economic development, and promoted the resumption of work and production in an accurate and orderly manner.

Recently, the Sixth Institute of Geology and Mineral Resources has insisted on "two hands" in epidemic prevention and control and economic development, and has promoted the resumption of work and production in an accurate and orderly manner. After the approval of the Zhaoyuan Municipal Government and the inspection by the Safety Section of the Academy, the "Shuiwangzhuang Gold Mine Exploration and Drilling Project" officially resumed work recently. 8 drilling rigs have been put into operation, with more than 100 people working.

At the Shuiwangzhuang construction site, project personnel insisted on wearing masks correctly, entering the site to measure body temperature, disinfecting the living and working areas on time, dispersing meals at the wrong time, propagating knowledge of epidemic prevention and control through warning signs, holding regular safety production meetings, and epidemic prevention and control measures Strict and orderly work.

Due to the large workload and tight schedule of the project, multiple drilling rigs are still required to be stationed in the near future. The Sixth Institute conducts business training for project managers, full-time safety officers and captains in batches to ensure that every project manager is familiar with the "resumption conditions" Contents such as "resumption process", "site management after resumption of work", and "epidemic emergency response" provide safety management guarantee for resumption of work and production.

In the next step of work, the Sixth Institute of Geology and Mines will further carry forward the spirit of the "hero geological team" and adopt more powerful measures to supervise and guide each project site to strictly follow the work requirements of the bureau and the party committee of the bureau and the party committee for epidemic prevention and control, and resume work and resume production. Anti-epidemic work and high-quality promotion of project work will lay a solid foundation for achieving the victory of epidemic prevention and control and economic development.